Which of the following identifies jobs or tasks to be completed and approved in previous week or at least three days in advance?

Deciding to implement Reliability Centered Maintenance (RCM) on a project is based on readiness of the organization. One of the main readiness factors is:

Which of the following BEST defines Industry Standards?

Which of the following is NOT a best practice category for replacement items found on a Bill of Material (BOM) or in a Computerized Maintenance Management System (CMMS)?

RCD workshop maintenance personnel are working on a 40-hour/week schedule. The workshop has the following information: • 40 maintenance crew personnel • Two planners/schedulers • Two supervisors • Estimated wrench time is 60% What is the estimated productive work available for RCD workshop?

What standard provides a structured approach to product quality through focus on detailed process documentation by maintaining appropriate records?

The probability that a machine or system can be made available to operate on demand within a specified interval of time regardless of whether an asset is repaired or replaced is the definition of which of the following?

Which of the following is the key element of reliability specifications?

When voltage on an electrical conductor, such as an antenna on a high-voltage transmission line, exceeds the threshold value, the air around it begins to ionize to form a blue or purple glow. What is this called?

Which of the following Key Performance Indicators (KPI) is NOT a maintainability parameter?

Which of the following personnel is responsible for deciding when the job should be executed in order to optimize the available resources and ensure level loading of hours versus available hours?

Streamlined Reliability Centered Maintenance (RCM) requires a thorough understanding of condition-monitoring technologies as well as analytical techniques. Which of the following condition-monitoring techniques is BEST for electrical motors or generators, and detects very slow fault progression over a long time?

A critical special equipment item requires maintenance. Why would hiring a specialist contractor be a better option than using the in-house maintenance team?

Who is the FIRST line of defense in watching for abnormal conditions in an asset and initiating corrective actions?

Which of the following is one of the requirements of an insulation system for machine stator winding?

Which of the following certifications in the Maintenance and Reliability (M&R) area is NOT one of the four major classifications?

Which of the following terms is defined as "a common set of values, beliefs, attitudes, perceptions, and accepted behaviors shared by individuals within an organization"?

Which of the following statements defines management of change?

Which one of the following correctly shows a leading and lagging indicator?

What monitoring methodology is most appropriate for checking quality during the manufacturing process?